Exhibits

Numerous exhibits are provided and are referenced from within the text of the General Guidelines and/or the Technical Sections. The AE shall be responsible for incorporating the exhibits into Contract Documents and editing as appropriate to make the exhibits specific to the project.


AE Minimum List of Deliverables has moved and been renamed. Please See...
Title Type Size
Exhibit 01 33 23-01 Electronic Construction Submittal Process docx 23 KB
Exhibit 01 33 23-01 Electronic Construction Submittal Process pdf 207 KB
Exhibit 01 35 46-01, Example IAQ Management Plan docx 24 KB
Exhibit 01 35 46-01, Example IAQ Management Plan pdf 300 KB
Exhibit 01 77 00-01, Architectural Requirements FSQA Pre-Substantial Verification Checklist pdf 26 KB
Exhibit 01 77 00-01, Architectural Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-02, Elevator Requirements FSQA Pre-Substantial Verification Checklist docx 21 KB
Exhibit 01 77 00-02, Elevator Requirements FSQA Pre-Substantial Verification Checklist pdf 32 KB
Exhibit 01 77 00-03, Plumbing Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-03, Plumbing Requirements FSQA Pre-Substantial Verification Checklist pdf 26 KB
Exhibit 01 77 00-04, Heating Requirements FSQA Pre-Substantial Verification Checklist pdf 27 KB
Exhibit 01 77 00-04, Heating Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-05, Cooling Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-05, Cooling Requirements FSQA Pre-Substantial Verification Checklist pdf 27 KB
Exhibit 01 77 00-06, Ventilation Requirements FSQA Pre-Substantial Verification Checklist pdf 26 KB
Exhibit 01 77 00-06, Ventilation Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-07, Controls Requirements FSQA Pre-Substantial Verification Checklist pdf 28 KB
Exhibit 01 77 00-07, Controls Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-08, EMS Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-08, EMS Requirements FSQA Pre-Substantial Verification Checklist pdf 27 KB
Exhibit 01 77 00-09, Electrical Distribution Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-09, Electrical Distribution Requirements FSQA Pre-Substantial Verification Checklist pdf 27 KB
Exhibit 01 77 00-10, Lighting Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-10, Lighting Requirements FSQA Pre-Substantial Verification Checklist pdf 25 KB
Exhibit 01 77 00-11, Emergency Power Requirements FSQA Pre-Substantial Verification Checklist docx 20 KB
Exhibit 01 77 00-11, Emergency Power Requirements FSQA Pre-Substantial Verification Checklist pdf 26 KB
Exhibit 01 77 00-12, Fire Alarm Requirements FSQA Pre-Substantial Verification Checklist pdf 91 KB
Exhibit 01 77 00-12, Fire Alarm Requirements FSQA Pre-Substantial Verification Checklist docx 21 KB
Exhibit 01 77 00-13, Routine Construction Inspection Report docx 21 KB
Exhibit 01 77 00-13, Routine Construction Inspection Report pdf 81 KB
Exhibit 01 91 13-01, Commissioning Roles and Responsibilities Template docx 35 KB
Exhibit 01 91 13-01, Commissioning Roles and Responsibilities Template pdf 192 KB
Exhibit 01 91 13-02, Title List Prefunctional Checklists and Functional Tests docx 18 KB
Exhibit 01 91 13-02, Title List Prefunctional Checklists and Functional Tests pdf 135 KB
Exhibit 01 91 13-03, Sample Prefunctional Checklist pdf 269 KB
Exhibit 01 91 13-03, Sample Prefunctional Checklist docx 59 KB
Exhibit 01 91 13-04, Sample Functional Test docx 76 KB
Exhibit 01 91 13-04, Sample Functional Test pdf 542 KB
Exhibit 01 91 13-05, Commissioning Process Definitions docx 23 KB
Exhibit 01 91 13-05, Commissioning Process Definitions pdf 88 KB
Exhibit 09 00 00-01, Master Room Finish Schedule dwg 187 KB
Exhibit 09 00 00-01, Master Room Finish Schedule Model pdf 178 KB
Exhibit 14 20 00-01, AE Process for Elevator Specification and Drawing Development pdf 166 KB
Exhibit 14 20 00-01, AE Process for Elevator Specification and Drawing Development docx 21 KB
Exhibit 14 20 00-02, Elevator Design Process Worksheet pdf 70 KB
Exhibit 14 20 00-02, Elevator Design Process Worksheet xlsx 24 KB
Exhibit 14 20 00-03, Elevator Job End Submittals Acceptance Document docx 22 KB
Exhibit 14 20 00-03, Elevator Job End Submittals Acceptance Document pdf 74 KB
Exhibit 14 21 00-01, Electric Traction Elevator Modernization Checklist docx 26 KB
Exhibit 14 21 00-01, Electric Traction Elevator Modernization Checklist pdf 112 KB
Exhibit 14 24 00-01, Hydraulic Elevator Modernization Checklist docx 24 KB
Exhibit 14 24 00-01, Hydraulic Elevator Modernization Checklist pdf 105 KB
Exhibit 23 09 13.33-1, Control Valve and Actuator Application Matrix pdf 34 KB
Exhibit 23 09 13.33-1, Control Valve and Actuator Application Matrix xlsx 34 KB
Exhibit 23 09 13-01a, Central Chilled Water Sequence of Operation docx 16 KB
Exhibit 23 09 13-01a, Central Chilled Water Sequence of Operation pdf 98 KB
Exhibit 23 09 23-01, Example Building Main Navigation Screen docx 183 KB
Exhibit 23 09 23-01, Example Building Main Navigation Screen pdf 333 KB
Exhibit 23 09 23-01a, Example Building Main Navigation Screen docx 328 KB
Exhibit 23 09 23-01a, Example Building Main Navigation Screen pdf 215 KB
Exhibit 23 09 23-01b, Example Building Main Navigation Screen docx 57 KB
Exhibit 23 09 23-01b, Example Building Main Navigation Screen pdf 30 KB
Exhibit 23 09 23-02, Example AHU Graphics Screen docx 423 KB
Exhibit 23 09 23-02, Example AHU Graphics Screen pdf 530 KB
Exhibit 23 09 23-02a, Example AHU Graphics Screen docx 435 KB
Exhibit 23 09 23-02a, Example AHU Graphics Screen pdf 297 KB
Exhibit 23 09 23-02b, Example AHU Graphics Screen docx 124 KB
Exhibit 23 09 23-02b, Example AHU Graphics Screen pdf 229 KB
Exhibit 23 09 23-03, Example AHU Zone Plan docx 747 KB
Exhibit 23 09 23-03, Example AHU Zone Plan pdf 513 KB
Exhibit 23 09 23-04, Example VAV Navagation Screen docx 85 KB
Exhibit 23 09 23-04, Example VAV Navagation Screen pdf 266 KB
Exhibit 23 09 23-04a, Example VAV Navigation Screen pdf 368 KB
Exhibit 23 09 23-04a, Example VAV Navigation Screen docx 250 KB
Exhibit 23 09 23-04b, Example VAV Navigation Screen docx 56 KB
Exhibit 23 09 23-04b, Example VAV Navigation Screen pdf 29 KB
Exhibit 23 09 23-04c, Example VAV Navigation Screen docx 250 KB
Exhibit 23 09 23-04c, Example VAV Navigation Screen pdf 368 KB
Exhibit 23 09 23-05, Example VAV Summary table docx 134 KB
Exhibit 23 09 23-05, Example VAV Summary table pdf 269 KB
Exhibit 23 09 23-05a, Example VAV Summary Table docx 371 KB
Exhibit 23 09 23-05a, Example VAV Summary Table pdf 133 KB
Exhibit 23 09 23-05b, Example VAV Summary Table docx 81 KB
Exhibit 23 09 23-05b, Example VAV Summary Table pdf 54 KB
Exhibit 23 09 23-07, Example VAV Graphic Screen docx 135 KB
Exhibit 23 09 23-07, Example VAV Graphic Screen pdf 296 KB
Exhibit 23 09 23-07a, Example VAV Graphics Screen docx 368 KB
Exhibit 23 09 23-07a, Example VAV Graphics Screen pdf 156 KB
Exhibit 23 09 23-07b, Example VAV Graphics Screen docx 48 KB
Exhibit 23 09 23-07b, Example VAV Graphics Screen pdf 27 KB
Exhibit 23 09 23-08a, VAV Box Sequence of Operation docx 19 KB
Exhibit 23 09 23-08a, VAV Box Sequence of Operation pdf 262 KB
Exhibit 23 09 23-09 AHU Standard VAV AHU Sequence of Operation docx 116 KB
Exhibit 23 09 23-09 AHU Standard VAV AHU Sequence of Operation pdf 400 KB
Exhibit 23 09 23-09a, Siemens, Wheel Graphics Template docx 103 KB
Exhibit 23 09 23-09a, Siemens, Wheel Graphics Template pdf 134 KB
Exhibit 23 09 23-10, Example ER Recovery Wheel Screen docx 132 KB
Exhibit 23 09 23-10, Example ER Recovery Wheel Screen pdf 288 KB
Exhibit 23 09 23-10a, Alpha System Graphics Wheel Presentation Example docx 90 KB
Exhibit 23 09 23-10a, Alpha System Graphics Wheel Presentation Example pdf 142 KB
Exhibit 23 09 23-11, Siemens IO Point Naming Convention dwg 193 KB
Exhibit 23 09 23-11, Siemens IO Point Naming Convention pdf 163 KB
Exhibit 23 09 23-12, Alpha IO Point Naming Convention dwg 194 KB
Exhibit 23 09 23-12, Alpha IO Point Naming Convention pdf 127 KB
Exhibit 23 09 23-13, Example DOA Graphics Screen docx 213 KB
Exhibit 23 09 23-13, Example DOA Graphics Screen pdf 344 KB
Exhibit 23 09 23-14 Energy Recovery Wheel Standard Sequence of Operation pdf 417 KB
Exhibit 23 09 23-14 Energy Recovery Wheel Standard Sequence of Operation docx 19 KB
Exhibit 23 09-23-06, Example VAV Small Scale Zone Plan docx 277 KB
Exhibit 23 09-23-06, Example VAV Small Scale Zone Plan pdf 404 KB
Exhibit 23 29 23-17a, TC Sched Air Flow Meters pdf 7 KB
Exhibit 23 29 23-17a, TC Sched Air Flow Meters xlsx 21 KB
Exhibit 23 29 23-17b, TC Sched Main Control Valves pdf 10 KB
Exhibit 23 29 23-17b, TC Sched Main Control Valves xlsx 26 KB
Exhibit 23 29 23-17c, TC Sched Control Dampers pdf 66 KB
Exhibit 23 29 23-17c, TC Sched Control Dampers xlsx 20 KB
Exhibit 23 29 23-17d, TC Sched Variable Frequency Drives (Provided by E.C.) pdf 7 KB
Exhibit 23 29 23-17d, TC Sched Variable Frequency Drives (Provided by E.C.) xlsx 19 KB
Exhibit 27 40 00-01, AV Performance Specifications xlsx 13 KB
Exhibit 27 40 00-01, AV Performance Specifications pdf 424 KB
Exhibit 27 40 00-02, AV Basis of Design docx 45 KB
Exhibit 27 40 00-02, AV Basis of Design pdf 943 KB
Exhibit 27 40 00-03, AV System Design Review pdf 1807 KB
Exhibit 27 40 00-03, AV System Design Review xlsx 45 KB
Exhibit 27 40 00-04, Submittal Drawing Checklist pdf 208 KB
Exhibit 27 40 00-05, Network Information pdf 843 KB
Exhibit 27 40 00-05, Network Information xlsx 28 KB
Exhibit 27 40 00-06, Equipment Tracking Report pdf 380 KB
Exhibit 27 40 00-06, Equipment Tracking Report xlsx 13 KB
Exhibit 27 40 00-07, Audio Video Submittal Checklist pdf 183 KB
Exhibit 27 40 00-07, Audio Video Submittal Checklist xlsx 16 KB
Exhibit 27 40 00-08, AV Staging Testing and Checklist pdf 575 KB
Exhibit 27 40 00-08, AV Staging Testing and Checklist xlsx 24 KB
Exhibit 27 40 00-09, AV Commissioning Tests and Checklist pdf 592 KB
Exhibit 27 40 00-09, AV Commissioning Tests and Checklist xlsx 27 KB
Exhibit 27 40 00-10, Testing and Verification Report pdf 1228 KB
Exhibit 27 40 00-10, Testing and Verification Report xlsx 34 KB
Exhibit 27 40 00-11 Control System Button by Button pdf 59 KB
Exhibit 27 40 00-11 Control System Button by Button xlsx 19 KB
Exhibit 31 25 00-01, SWPPP Inspection Report Checklists docx 22 KB
Exhibit 31 25 00-01, SWPPP Inspection Report Checklists pdf 106 KB
Exhibit 31 25 00-02, Construction Site Storm Water Discharge Incidence of Noncompliance (ION) Report Forms docx 20 KB
Exhibit 31 25 00-02, Construction Site Storm Water Discharge Incidence of Noncompliance (ION) Report Forms pdf 20 KB
Exhibit 31 25 00-03, Report Form For Changes in SWPPP docx 16 KB
Exhibit 31 25 00-03, Report Form For Changes in SWPPP pdf 58 KB
Exhibit 32 93 00-01, Approved Plant List pdf 24 KB
Exhibit 32 93 00-01, Approved Plant List xlsx 38 KB