Approved Traffic Closure - Green St. between Locust and First
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
In order to facilitate window maintenance at 55 E. Green Street, Arrow Glass will close the eastbound lane of Green Street between Locust Street and First Street. The closure will occur on Thursday, February 25, 2021, from the hours of 7 a.m. and 6 p.m. An eastbound and a westbound lane of traffic will be maintained through the area and traffic will not be interrupted.
Intersecting Streets which are affected or define limits of closure: Green St. from Locust Street to First Street
Reason for Closure: Building maintenance
Project Contact: Harman Jordan
Phone: 217-403-4700
Green Street Lane Closure PDF
EMERGENCY Traffic Closure - Gregory Dr water main break between 4th and 6th Streets 2-3-21 to 2-5-21
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Gregory Dr between 4th and 6th Street
Intersecting Streets which are affected or define limits of closure: Street to be closed between 4th and 6th street for thru traffic.
Amory access is available as well as E12 is accessible. Building #1206 dock will have access. E5 parking will also have access.
Reason for Closure: Water main broken and needs to be repaired
Additional Closure Information:
Project On-Site Contact Person: Rube King
Phone Number: 217-840-3985
U of I Project Manager (PM): Robbie Bauer
U of I PM Phone Number: 314-277-8870
EMERGENCY Traffic Closure - Gregory Dr water main break between 4th and 6th Streets 2-3-21 to 2-5-21
Champaign Street Closure – Fourth Street lane closure between Green Street and John Street on 12-09-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Southbound lane closed on Fourth Street between Green Street and John Street
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: to complete an emergency roof repair at 707 S. Fourth
Additional Closure Information:
Northbound traffic will be maintained and will continue uninterrupted through the area. However, no southbound traffic will be allowed between Green Street and John Street.
Project Contact: Harman Jordan
Phone: (217) 403-4700
harman.jordan@champaignil.gov
12.08.20 - Fourth Street Lane Closure

Champaign Street Closure – Chalmers Street between Fourth Street and Third Street from 12-08-2020 to 12-15-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Chalmers Street between Fourth Street and Third Street
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: to connect sanitary sewer service at 303 E. Chalmers Street
Additional Closure Information:
The street will be closed to through traffic, but access to all local properties will be maintained.
Project Contact: Harman Jordan
Phone: (217) 403-4700
harman.jordan@champaignil.gov
12.04.20 Chalmers Street Road Closure
Approved Traffic Closure - Oak St & sidewalk between Armory & Gregory Dr 12-3-20
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Oak Street
Intersecting Streets which are affected or define limits of closure: Oak Street between Gregory and Armory
Reason for Closure: Crane Operation Set Up to Remove a Man Lift Over the Fence from between Abbott Power Plant and Oak St
Additional Closure Information:
Project Contact: Rich Wurmnest
Phone number: 217-402-6258
Approved Traffic Closure - Oak St & sidewalk between Armory & Gregory Dr 12-3-20
Approved Traffic Closure - 4th St traffic bike lane between Armory Gregory Dr 11-23-20
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Northbound lane on South Fourth Street from Gregory Drive and Armory Avenue
Intersecting Streets which are affected or define limits of closure: E Armory Ave
Reason for Closure: Exposing forced sewer main, high pressure main in roadway, U of I communications, Ameren gas dist. and aqua water
Additional Closure Information:
Approved Traffic Closure - 4th St traffic & bike lane between Armory & Gregory Dr 11-23-20
Approved Traffic Closure - Oak St & sidewalk between Armory & Gregory Dr on 11-10-20
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Oak St
Intersecting Streets which are affected or define limits of closure: Oak Street between Gregory and Armory
Reason for Closure: Crane Operation Set Up to Set a Man Lift Over the Fence between Abbott Power Plant and Oak St
Additional Closure Information:
Project Contact: Rich Wurmnest
Phone: 217-402-6258
U of l Project Manager (PM): Mike Larson
Approved Traffic Closure - Oak St & sidewalk between Armory & Gregory Dr 11-10-20
Approved Sidewalk Closure - Sidewalk segments on North Quad 11-03-2020 to 11-11-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk
Intersecting Streets which are affected or define limits of closure: N/S Sidewalk on the north side of the east entrance of Talbot Lab and south of the west sidewalk of Grainger Library
Reason for Closure: Installation of Telecom Ductbank Campus Instructional Facility construction site
Additional Closure Information:
Project Contact: Josh Jones
Phone: 224-422-7073
U of I Project Manager (PM): Clarence Odom
Phone: 217-305-1306
Approved Sidewalk Closure - Sidewalk segments on North Quad 11-3-20 to 11-11-20
Approved Sidewalk Closure - Sidewalk segments on North Quad 11-3-2020 to 11-11-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk
Intersecting Streets which are affected or define limits of closure: N/S Sidewalk on the north side of the east entrance of Talbot Lab and south of the west sidewalk of Grainger Library
Reason for Closure: Installation of Telecom Ductbank Campus Instrutional Facility construction site
Additional Closure Information:
Project Contact: Josh Jones
Phone: 224-422-7073
U of I Project Manager (PM): Clarence Odom
Phone: 217-305-1306
Approved Sidewalk Closure - Sidewalk segments on North Quad 11-3-20 to 11-11-20
Wright Street Closure - Kenney Gym Sanitary Sewer Repair Drainage from 10/28/2020 to 11/04/2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Wright St just north of Springfield Avenue
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: to complete sanitary sewer repairs for Kenney Gymnasium
Additional Closure Information: Road closed barricades, construction warning and detour signs will be posted on site.
Expected Schedule: It is anticipated that work will begin on Wednesday, October 28, 2020. The Anticipated duration of closure is one week.
Project Contact: Justin Weidner A&R Services
Phone: (217) 202-0945
jweidner@ar-mech.com
University Contact: Stacey DeLorenzo
Phone: (217) 300-0340
sdeloren@illinois.edu
10.27.20 - Wright St. Closure Date Correction

Approved Traffic Closure - Oak St & sidewalk between Armory & Gregory Dr from 10-26-20 to 10-30-20
Urbana Street Closure – West Florida Avenue Lane Closed Between South Busey Avenue And South Race Street until 10/30/20
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Eastbound lane of West Florida Avenue will be closed to thru traffic between South Busey Avenue and South Race Street
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: Cross Construction will be performing pavement repairs at various locations along West Florida Avenue
Additional Closure Information:
Access will be maintained to all properties along West Florida Avenue between South Busey Avenue and South Race Street during the project though no thru traffic will be allowed going eastbound. There will be a marked detour route from South Lincoln Avenue to West Pennsylvania Avenue to South Race Street. Motorists are encouraged to drive carefully through this and all construction areas.
Project Contact: Adam Shaw
Phone: (217) 384-2342
ajshaw@urbanaillinois.us

Champaign Street Closure – Northbound Fourth St Lane between John St and Daniel St closed until from 10/26/20 to 11/02/20
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Fourth Street Lane Closure between John Street and Daniel Street
Intersecting Streets which are affected or define limits of closure: southbound lane of Fourth Street between John Street and Daniel Street
Reason for Closure: to connect sanitary sewer service at 315 E. John Street, Wells & Wells Construction and Wick Concrete
Additional Closure Information:
The closure will begin on Monday, October 26, and will reopen on Monday, November 2, 2020. Northbound traffic will be maintained during this construction.
Project Contact: Harman Jordan
Phone: (217) 403-4700
harman.jordan@champaignil.gov
10.22.20 - Fourth Street Lane Closure

Approved Partial Traffic Closure - St. Marys Rd near soccer fields on 10-14-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: St. Mary’s Rd; West bound lane
Intersecting Streets which are affected or define limits of closure: East of 4th street; south side of Demirjian Park / Wieneke Track stadium videoboard
Reason for Closure: Install new vinyl graphics on backside of Demirjian Park / Wieneke Track stadium videoboard with boom lift
Additional Closure Information:
Project Contact: Dean’s Graphics (Brandon Christie)
Phone: 217-363-1390
U of I Project Manager: Eric Vetter
Phone: 217-333-0534
Approved Partial Traffic Closure - St. Marys Rd near soccer fields 10-14-20
Approved Sidewalk Closure - Gregory Dr on north sidewalk from 4th to 6th St from 9-24-20 to 10-1-20
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Gregory Drive sidewalk between 4th and 6th on the north side
Intersecting Streets which are affected or define limits of closure: none
Reason for Closure: replace sidewalk pavers and electrical vault cover
Additional Closure Information:
Project Contact: Justin Culberton
Phone: 217-390-0122
U of I Project Manager: Jerry Lauderdale
Phone: 217-244-6136
Approved Sidewalk Closure - Gregory Dr on north sidewalk from 4th to 6th St from 9-24-20 to 10-1-20
Approved Closure - South Plaza & Alternating Entrances of Illini Union from 9-16-20 to 10-09-20
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk on the South side of the Illini Union, see plan A & B/C
Intersecting Streets which are affected or define limits of closure: Wright/Matthews
Reason for Closure: Crane will pick material from the ground to the staging area on the roof as well as remove debris from the roof to the ground. Roofing materials and personnel will be moved to the roof as needed using man lift.
Additional Closure Information:
Project Contact: John Round AGAE Superintended
Phone number: 847-772-1079
U of I Project Manager: S. Renee Wiley
Phone number: 217-244-3973
Approved Closure - South Plaza & Alternating Entrances of Illini Union from 9-16-20 to 10-09-20
Approved Traffic Closure - Emergency water main repair - Oak St, Gregory Dr, Armory Ave & Stadium Dr area until 9-14-20
Approved Sidewalk Closure - Broadwalk on East of the Main Quad on 8-17-2020 and 8-18-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: The north-south broad-walk on the east side of the main Quad
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: Delivery of Air Handling Unit For Davenport Hall – West Renovation Project
Additional Closure Information:
Project Contact: Greg Gillen
Phone: 217-329-5367
U of I Project Manager: Stan Lamaster
Phone: 217-244-7844
Approved Sidewalk Closure - Broadwalk on east side of Main Quad 8-17-20 to 8-18-20
Approved Sidewalk Closure - South Plaza of the Illini Union from 8-14-2020 to 9-7-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk on the South side of the Illini Union, see plan A & B/C
Intersecting Streets which are affected or define limits of closure: Wright/Matthews
Reason for Closure: Truck mounted crane will pick material from the truck bed to the staging area at the ground level. Roofing materials will be moved to the roof as needed using man lift. Crane pick 8/14/2020 from 7am – 11:30am
Additional Closure Information:
Project Contact: John Round AGAE Superintended
Phone: 847-772-1079
U of I Project Manager: S. Renee Wiley
Phone: 217-244-3973
Approved Sidewalk Closure - south plaza of Illini Union 8-14-20 to 9-7-20
Approved Traffic Closure - Lincoln Ave lane reduction south of Florida from 8-11-20 to 8-14-20
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: S. Lincoln Ave, south of Florida
Intersecting Streets which are affected or define limits of closure: center lane of S. Lincoln approx. 200’ south of Florida Ave.
Reason for Closure: Communications duct cleaning and inner-duct installation (no digging, using existing structures for access).
Additional Closure Information:
Project Contact: James Driskill
Phone: 309-696-8920
U of I Project Manager: Vince Tutich
Phone: 217-390-7778
Approved Traffic Closure - Lincoln Ave Lane Reduction south of Florida 8-11-20 to 8-14-20
Champaign Street Closure - Chalmers St between Fourth St and Fifth St from 07-27-2020 to 07-31-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Chalmers St between Fourth St and Fifth St
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: repair pavement failures
Additional Closure Information:
Project Contact: Pete Vanderkloot
Phone: (217) 403-4700
pete.vanderkloot@champaignil.gov
Feutz Contractors: Brad Shotton
Phone: 217-304-6300
07.23.20 - Chalmers Street Closure
Champaign Street Closure - Sixth St and John St Intersection closed until 08-11-2020 [Extended]
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sixth Street and John Street Intersection Closure – Extended Until August 11
Intersecting Streets which are affected or define limits of closure: Sixth and John
Reason for Closure: to complete a sanitary sewer main install
Additional Closure Information:
The following closures and traffic adjustments will also occur in order to maintain local access:
• John Street between Fifth Street and Sixth Street will change to bidirectional traffic.
• John Street between Sixth Street and Wright Street will change to bidirectional traffic.
• Sixth Street between Green Street and John Street will be closed.
Project Contact: Harman Jordan
Phone: (217) 403-4700
harman.jordan@champaignil.gov
08.07.20 - Sixth and John Intersection Closure - Extended

Champaign Street Closure - Sixth St and John St Intersection closed until 08-14-2020 [Extended]
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sixth Street and John Street Intersection Closure – Extended Until August 14
Intersecting Streets which are affected or define limits of closure: Sixth and John
Reason for Closure: to complete a sanitary sewer main install
Additional Closure Information:
The following closures and traffic adjustments will also occur in order to maintain local access:
• John Street between Fifth Street and Sixth Street will change to bidirectional traffic.
• John Street between Sixth Street and Wright Street will change to bidirectional traffic.
• Sixth Street between Green Street and John Street will be closed.
Project Contact: Harman Jordan
Phone: (217) 403-4700
harman.jordan@champaignil.gov
08.11.20 - Sixth and John Intersection Closure - Extended

Sixth Street Road Closure (between Green Street and John Street)
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sixth Street Road Closure (between Green Street and John Street)
Reason for Closure:
In order to facilitate construction at 708 S. Sixth Street, Core Spaces and JH Findorff will close Sixth Street between Green Street and John Street.
The closure has been scheduled to occur from Friday, June 12 through Sunday, June 14, 2020. During the closure, Sixth Street will be closed to through traffic between Green Street and John Street. The work is weather dependent and may be delayed in the event of inclement weather.
Additional Closure Information:
Project Contact: Kris Koester
Phone: (217) 403-4700
Kris.Koester@champaignil.gov
Champaign Street Closure - Daniel St between Sixth St and Wright St on 05-26-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Daniel Street between Sixth Street and Wright Street
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: first-floor concrete pour
Additional Closure Information: Through traffic will not be allowed during the closure. Access to affected properties on Wright Street will be maintained from Armory Avenue.
Project Contact: Harman Jordan
Phone: (217) 403-4700
harman.jordan@champaignil.gov
05.21.20 - Daniel Street Road Closure - Sixth to Wright RESCHEDULED
Champaign Street Closure - MCORE Project 4 – Chalmers Street between Sixth St and Wright St from 05-26-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Chalmers Street between Sixth St and Wright St
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: MCORE Project Phase 4 - Chalmers Street between Sixth Street and Wright Street to facilitate the reconstruction of this entire block (street pavement, street lighting, etc.)
Additional Closure Information: This closure is scheduled to reopen in August 2020.
Project Contact: Kris Koester
Phone: (217) 403-4700
Kris.Koester@champaignil.gov
05.22.20 - MCORE Chalmers Street Closure
Champaign Street Closure - Daniel St between Third St and Fourth St from 05-18-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Daniel Street between Third Street and Fourth Street
Intersecting Streets which are affected or define limits of closure: Daniel Street and Fourth Street
Reason for Closure: City’s 2020 Concrete Street Improvements Project
Additional Closure Information:
Project Contact: William Holland
Phone: (217) 841-9692
bill.holland@champaignil.gov
05.14.20 - Daniel Street Road Closure
Approved Traffic Closure - Illini Veterans Memorial 5K on 04-05-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: barricades for the Northwest corner of Gregory and Goodwin. Barricades for the Northwest corner of Gregory and 6th Street. Block off Gregory where the Quad and South quad connect.
Intersecting Streets which are affected or define limits of closure: Gregory Drive
Reason for Closure: Illini Veterans Memorial 5K
Additional Closure Information:
Project Contact: William Smith
Phone: (636) 266-1512
5K Illini Veteran Traffic Closure request & diagram 4-5-2020
Champaign Street Closure - MCORE Project 4 - Temporary Closure of the intersection of Wright St. and Green St. from 04-01-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Temporary closure of the intersection of Wright St. and Green St.
Intersecting Streets which are affected or define limits of closure: Wright and Green
Reason for Closure: MCORE Project 4 Wright St and Green St intersection reconstruction
Additional Closure Information:
Project Contact: Kris Koester
Phone: (217) 403-4700
kris.koester@champaignil.gov
03.27.20 - MCORE Wright & Green Closure
Champaign Street Closure - Sixth Street Road Closure (Between Green St and John St) from 03-23-2020 to 03-27-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sixth Street between Green Street and John Street
Intersecting Streets which are affected or define limits of closure: Sixth and Green; Sixth and John
Reason for Closure: To facilitate crane removal
Additional Closure Information:
Project Contact: Harman Jordan
Phone: (217) 403-4700
03.17.20 - Sixth Street Road Closure
Approved Sidewalk & one-traffic lane Closure - Kirby Ave from Oak St to Neil St from 3-16-20 to 3-20-20
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: One westbound lane of Kirby Avenue from Oak St to Neil St; sidewalk on the north side of Kirby Ave from Oak St to Neil St
Intersecting Streets which are affected or define limits of closure: N/A
Reason for Closure: Sanitary sewer leak/road repair
Additional Closure Information:
Project Contact: Andrew Franklin
Phone: (217) 649-8949
Approved Sidewalk & one-traffic lane Closure - Kirby Ave from Oak St to Neil St from 3-16-20 to 3-20-20
Approved Sidewalk Closure - North of the Architecture Building from 3/16/2020 to 3/20/2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: North-South sidewalk leading up to Architecture Building closest to David Kinley Hall as well as the ADA ramp access into Architecture Building located on the northeast portion of the building. (See
attached maps)
Intersecting Streets which are affected or define limits of closure: N/A
Reason for Closure: Underground Drainage Renovations
Additional Closure Information:
Project Contact: Daniel Wilson
Phone: (217) 202-5728
U of I Project Manager: Renee Wiley
Approved Sidewalk Closure - north of the Architecture Building 3-16-20 to 3-20-20
Approved Sidewalk Closure - South Entrance Sidewalk in front of Engineering Hall from 3/16/2020 to 3/20/2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: South Entrance Walk into Engineering Hall
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Placement of large truck mounted HEPA dust vacuum for hallway refinishing in Engineering Hall
Additional Closure Information:
Project Contact: Dan Maier
Phone: (217) 493-5318
U of I Project Manager: Rusty Woliung
Phone: (217) 714-5452
Approved Sidewalk Closure - in front of Engineering Hall 3-16-20 to 3-20-20
Champaign Street Closure - Daniel Street Road Closure (between Sixth Street and Wright Street) from 03-16-2020 to 03-23-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Daniel Street between Sixth Street and Wright Street.
Intersecting Streets which are affected or define limits of closure: Daniel Street, Wright Street, Sixth Street
Reason for Closure: install a tower crane at 812 S. Sixth Street
Additional Closure Information:
Project Contact: harman Jordan
Phone: (217) 403-4700
03.09.20 - Daniel Street Road Closure
Champaign Street Closure - Healey Street Road Closure (between First Street and Second Street) from 03-16-2020 to 03-23-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Healey Street between First Street and Second Street.
Intersecting Streets which are affected or define limits of closure: First and Healey, Second and Healey
Reason for Closure: install sanitary sewer service connection at 103 E. Healey Street
Additional Closure Information:
Project Contact: harman Jordan
Phone: (217) 403-4700
03.09.20 - Healey Street Road Closure
Champaign Street Closure - Healey Street Road Closure (between Fifth Street and Sixth Street) from 03-16-2020 to 03-23-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Healey Street between Fifth Street and Sixth Street.
Intersecting Streets which are affected or define limits of closure: Fifth and Healey, Sixth and Healey
Reason for Closure: install sanitary sewer service connection at 502 E. Healey
Additional Closure Information:
Project Contact: Harman Jordan
Phone: (217) 403-4700
03.10.20 - Healey Street Road Closure
Champaign Street Closure - Intersection of Wright St and Green St from 03-16-2020 to 03-23-2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: The intersection of Wright St and Green St
Intersecting Streets which are affected or define limits of closure: Wright and Green
Reason for Closure: water main related to the MCORE project
Additional Closure Information:
Project Contact: Stacey DeLorenzo
Phone: (217) 722-4992
Approved Sidewalk Closure - Sidewalk West, North, and East of the Architecture Building from 2/10/2020 to 4/15/2020
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalks to the west, north, and east of the Architecture Building per the schedule and phasing plan
Intersecting Streets which are affected or define limits of closure: N/A
Reason for Closure: Drainage Renovations
Additional Closure Information:
On-site Contact: John Murphy (PM - AGAE Contractors)
Phone: (773) 842-1646
Approved Sidewalk Closure - west, north, and east of the Architecture Building 2-10-20 to 4-15-20
Approved Sidewalk Closure - Sidewalk South side Gregory Dr between Oak St and First St from 11/25/19 to 11/27/19
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk South Side Gregory Dr between Oak St & First St.
Intersecting Streets which are affected or define limits of closure: Front of gate to Tennis Comis on south side Gregory
Reason for Closure: Remove & Replace 3-panels of damaged Sidewalk
Additional Closure Information:
On-site Contact: Kyle Ryan
Phone: (217) 590-6000
U of I Project Manager: Grant Colella
Phone: (217) 300-1775
Approved Sidewalk Closure - segment on south side of Stadium between Oak & 1st on 11-25-19 to 11-27-19
Approved Sidewalk Closure - Sidewalks around Alma Mater from 11/24/2019 to 11/28/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalks around Alma Mater
Intersecting Streets which are affected or define limits of closure: none
Reason for Closure: Tree removal landscape improvement
Additional Closure Information:
On-site Contact: Isaac Williams
Phone: (217) 333-2419
Approved Sidewalk Closure - Sidewalks around Alma Mater 11-25-19
Approved Sidewalk Closure - Additional Sidewalk segments on North Quad from 11/23/19 to 12/16/19
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalks
Intersecting Streets which are affected or define limits of closure: N/S Sidewalk on the north side of the east entrance of Talbot Lab and south of the west sidewalk of Grainger Library
Reason for Closure: Installation of Geo Thermal piping into Campus Instructional Facility construction site
Additional Closure Information:
On-site Contact: Mick Schuster
Phone: (847) 609-7909
U of I Project Manager: Doug Reddington
Approved Sidewalk Closure - Additional Sidewalk segments on North Quad 11-23-19 to 12-16-19
Approved Traffic Closure - REVISED Goodwin Ave from Peabody to Pennsylvania Ave from 11/20/2019 to 11/22/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Goodwin Ave between Peabody Ave & Pennsylvania Ave
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: Mill & overlay of pavement for repair
Additional Closure Information:
Project Contact: Chris Uppinghouse
Phone: (217) 202-8578
U of I Project Manager: Stacey DeLorenzo
Phone: (217) 300-1750
Approved Traffic Closure - Goodwin Ave from Peabody to Pennsylvania 11-20-19 to 11-22-19
Approved Traffic Closure - Goodwin Ave from Peabody to Pennsylvania Ave from 11/18/2019 to 11/21/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Goodwin Ave between Peabody Ave & Pennsylvania Ave
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: Mill & overlay of pavement for repair
Additional Closure Information:
Project Contact: Chris Uppinghouse
Phone: (217) 202-8578
U of I Project Manager: Stacey DeLorenzo
Phone: (217) 300-1750
Approved Traffic Closure - Goodwin Ave from Peabody to Pennsylvania 11-18-19 to 11-21-19
Approved Sidewalk & Bike Path Closure - South of Freer Hall on Gregory Dr from 11/09/2019 to 11/14/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk on Gregory at the south entrance to Freer Hall
Intersecting Streets which are affected or define limits of closure: NA
Reason for Closure: Concrete removal and pouring back new sidewalk on the north side of Gregory Drive
Additional Closure Information:
On-site Contact: Jake Adkins
Phone: (847) 997-8952
U of I Project Manager: Stan Lamaster
PM phone number: (217) 244-7844
Approved Sidewalk & bike path Closure - South of Freer Hall on Gregory Dr 11-9-19 to 11-14-19
Approved Sidewalk & Bike Path Closure - EXTENDED South of Freer Hall on Gregory Dr will open on 11/16/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk on Gregory at the south entrance to Freer Hall
Intersecting Streets which are affected or define limits of closure: NA
Reason for Closure: Concrete removal and pouring back new sidewalk on the north side of Gregory Drive
Additional Closure Information:
On-site Contact: Jake Adkins
Phone: (847) 997-8952
U of I Project Manager: Stan Lamaster
PM phone number: (217) 244-7844
Approved Sidewalk & bike path Closure - South of Freer Hall on Gregory Dr 11-9-19 to 11-14-19
Approved Sidewalk & Bike Path Closure - North of Freer Hall from Goodwin East from 10/17/2019 to 10/21/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Concourse (sidewalk and bike paths) between Busey-Evans Hall, Child Development, CRCE and Freer Hall.
Intersecting Streets which are affected or define limits of closure: Closure terminates at Goodwin on the west end.
Reason for Closure: Construction traffic to and from the project site at Freer Hall, north side of building
Additional Closure Information:
On-site Contact: Jake Adkins, Path Construction Co.
Phone: (847) 997-8952 cell
U of I Project Manager: Stan Lamaster
PM phone number: (217) 202-2926
Approved Sidewalk & bike path Closure - North of Freer Hall from Goodwin east 10-17-19 to 10-21-19
Approved Traffic Closure - Fourth Street from Kirby Ave to Pennsylvania Ave on 10/11/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Fourth Street between Kirby Avenue and Pennsylvania Avenue
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: Butkus Statue Dedication outside of the Smith Center. Seating must be placed on 4th Street. And for the safety of guests, the road should be closed
Additional Closure Information:
Project Contact: Bobbi Busboom
Phone: (217) 649-3107
Approved Traffic Closure - Fourth St from Kirby to Pennsylvania 10-11-19
Approved Sidewalk Closure - East-West Sidewalk South of Wardall Hall next to the circle drive from 10/10/2019 to 10/14/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: East west sidewalk south of Wardall Hall next to the circle drive.
Intersecting Streets which are affected or define limits of closure: none
Reason for Closure: Sidewalk concrete pour
Additional Closure Information:
On-site Contact: Brian Dearing
Phone: (217) 821-6868
U of I Project Manager: Arlene Vespa
PM phone number: (217) 300-7644
Approved Sidewalk Closure - South of Wardall Hall 10-10-19 to 10-14-19
Approved Sidewalk Closure - EXTENDED CLOSURE East-West Sidewalk South of Wardall Hall next to the circle drive to 10/16/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: East west sidewalk south of Wardall Hall next to the circle drive.
Intersecting Streets which are affected or define limits of closure: none
Reason for Closure: Sidewalk concrete pour
Additional Closure Information:
On-site Contact: Brian Dearing
Phone: (217) 821-6868
U of I Project Manager: Arlene Vespa
PM phone number: (217) 300-7644
Approved Sidewalk Closure - South of Wardall Hall 10-10-19 to 10-14-19
Approved Moving Traffic Closure - Sidewalks along the entirety of the Tri-the-Illini run course on 10-06-2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: The entirety of the run course will be on the Sidewalks
Intersecting Streets which are affected or define limits of closure: Gregory Drive. Peabody Drive will be closed from 4th and 6th for the race finish. (See Diagram below)
Reason for Closure: Tri-the-Illini run
Additional Closure Information:
Contact: Ava Fiandaca
Phone: (630) 270-8186
Approved Moving Traffic Closure - Tri-the-Illini Run 10-6-19
Approved Traffic Closure - Kirk Drive complete closure starting 10/03/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Kirk Drive
Intersecting Streets which are affected or define limits of closure: Gerty Drive to south end (circle) of Kirk Drive
Reason for Closure: Reconstruction
Additional Closure Information:
Project Contact: Josh Rubin
Phone: (217) 300-2469
Approved Traffic Closure - Kirk Drive complete closure starting 10-3-19
Approved Traffic Shift - Fourth St Lane Shift Gregory to Peabody on 10-02-2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: 4th Street - lanes shift to the west & parking bagged
Intersecting Streets which are affected or define limits of closure: No intersecting streets- road needs to have lanes shift on the West side of Design Center building
Reason for Closure: Crane for Design Center
Additional Closure Information:
Contact: Neal Asklund
Phone: (217) 202-0429
Approved Traffic Shift - Fourth St Lane Shift Gregory to Peabody 10-2-19
Approved Traffic Closure - St. Mary's Road lane reduction 1st and 4th St from 9/24/2019 to 10/12/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: St. Mary's Rd Lane Reduction
Intersecting Streets which are affected or define limits of closure: Mary’s Rd will be reduced to 1 lane each direction between 1st Street and 4th St.
Reason for Closure: Install a crosswalk
Additional Closure Information:
On-Site Contact: Daniel Wilson
Phone: (217) 202-5728
U of I Project Manager: Stacey DeLorenzo
U of I PM Phone Number: (217) 300-1750
Approved Traffic Closure - St. Marys Rd Lane Reduction 1st St to 4th St 9-24-19 to 10-12-19
Urbana Street Closure - South Goodwin Ave lane shift and sidewalk closure from 9/23/2019 to 10/31/2019
Closure Begins:
Reopens:
South Goodwin Avenue Lane shift and sidewalk closure
Weather permitting; Southbound Traffic on South Goodwin Avenue will be shifted into the east turn lane from 10:00 a.m. Monday, September 23, 2019 through 3:30 p.m. Thursday October 31, 2019 for Building Improvements on the Mechanical Engineering Building done by Otto Baum Company Inc. The sidewalk on the west side of South Goodwin Avenue next to the Mechanical Engineering Building will be closed during the Lane Shift. Access will be maintained to all properties along South Goodwin Avenue during the project. Traffic control will be in place to guide motorists through the areas where travel is reduced to one lane.
Motorists are encouraged to drive carefully through this and all construction areas. Thank you in advance for your patience and cooperation during this project. Questions or concerns may be directed to Mr. Ben Holzhausen at (217) 384-2342 or beholzhausen@urbanaillinois.us.
For more information about the City of Urbana, please visit www.urbanaillinois.us.
Additional Closure Information:
Contact: Ben Holzhausen
Phone: (217) 384-2342
Email: beholzhausen@urbanaillinois.us

Approved Sidewalk Closure - East West Sidewalk South of Talbot Lab parallel with Boneyard Creek from 9/12/19 to 9/18/19
Approved Traffic Closure - West bound lane of Peabody East of 4th closed from 9/9/2019 to 9/16/2019
Approved Traffic Closure - Lincoln Avenue closed for Matsuri Festival on 9-8-2019 from 12 pm to 9 pm
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Lincoln Ave
Intersecting Streets which are affected or define limits of closure: Between St. Mary’s Road and north of Hazelwood Ave. (Access to parking lots F-32 and F-27 will be maintained)
Reason for Closure: Matsuri Festival, pedestrian crossings and safety
Additional Closure Information:
Contact: Michael Darin
Phone: (217) 244-9934
Approved Traffic Closure - Matsuri Festival 2019 Lincoln Ave Closure Request 9-8-19
Approved Sidewalk Closure - South of Design Center Construction Site
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: See attached drawing
Intersecting Streets which are affected or define limits of closure: Sidewalk along south side of the construction site for the Design Center and north of parking lot E-18 (between 4th Street and 6th street)
Reason for Closure: Design Center Topping out Ceremony
Additional Closure Information:
Contact: Peter Quinlan
Phone: (312) 636-0051
Approved Sidewalk Closure - South of Design Center Construction Site 9-5-19
Approved Sidewalk Closure - Sidewalk segments along Chalmers St & North of Lincoln Hall from 9/3/2019 to 9/24/2019
Approved Sidewalk Closure - REVISED Sidewalk segments along Chalmers St & North of Lincoln Hall closed until 10/04/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk Chalmers west of Wright St & sidewalk leading to main Quad north of Lincoln Hall (EXTENDED closure till 10/04/2019)
Intersecting Streets which are affected or define limits of closure: n/a
Reason for Closure: Utility work to re-route CHW under the steam tunnel
Additional Closure Information:
Contact: Ryan Barkdull
Phone: (317) 517-5697
Approved Sidewalk Closure - Sidewalk segments along Chalmers & north of Lincoln Hall from 9-3-19 to 9-24-19
Champaign Street Closure - Green St Closure between Sixth St and Wright St from 9/3/2019 to 9/13/2019
Closure Begins:
Reopens:
Champaign – In order to construct a new sanitary sewer main from the new development at 708 S. Sixth Street, Duce Construction will close Green Street, between Sixth Street and Wright Street. The sanitary sewer requires connection to the UCSD interceptor on Healey Street. The construction of the new sanitary sewer main includes a new manhole in the intersection of Green Street and Sixth Street.
The closure is scheduled to start at 7:00 a.m. on Tuesday, September 3 and end by noon on Friday, September 13. A traffic control plan is included.
The City appreciates the cooperation of travelers in the area and encourages caution when traveling in proximity to a work zone.
Additional Closure Information:
Contact: Harman Jordan
Phone: (217) 403-4700
Email: Harman.Jordan@champaignil.gov
Contact: Marchello Graddy
Phone: (217) 403-4700
Email: Marchello.Graddy@champaignil.gov
08.27.19 - Green Street Road Closure (Sixth to Wright)

Champaign Street Closure - Fifth Street between Chalmers Street and Daniel Street from 8/26/2019 to 9/3/2019
Closure Begins:
Reopens:
Champaign – In order to repair a sanitary sewer service at 912 S. Fifth Street, A & R Services will close Fifth Street between Chalmers Street and Daniel Street. The closure will begin on Monday, August 26, and reopen on Tuesday, September 3, 2019. The road will be closed to through traffic but access to local properties will be maintained with an entrance on Daniel Street.
Please pay close attention to traffic control devices and use alternate routes whenever possible. The City of Champaign thanks you for your cooperation and patience while this work is being performed.
Additional Closure Information:
Contact: Harmon Jordan
Phone: (217) 403-4700
Email: harmon.jordan@champaignil.gov
08.22.19 - Fifth Street Road Closure

Champaign Street Closure - MCORE Project 4 – Closure of the West Leg of Chalmers Street at Wright Street from 08/26/2019
Closure Begins:
Reopens:
Champaign – On Monday, August 26, 2019, the Multimodal Corridor Enhancement Project (MCORE) will close the west leg of Chalmers Street at Wright Street to reconstruct the western half of the intersection.
Northbound Wright Street traffic will need to continue north on Wright Street. Eastbound Chalmers Street traffic will not have access to Wright Street. Work is expected to continue through mid-September, weather permitting.
The City of Champaign appreciates the cooperation and patience of property owners, residents, and visitors of the Campustown area during this important project. Additional updates will be provided as the project progresses. For additional information, visit www.mcoreproject.com.
Additional Closure Information:
Contact: Kris Koester
Phone: (217) 403-4700
Email: Kris.Koester@champaignil.gov
08.22.19 - MCORE Closure of Chalmers at Wright

Approved Street Closure - Kirby Ave from 1st to 4th St and First St from Kirby and Peabody on 08-23-2019 from 9:30 am to 12:15 pm
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Kirby Ave from 1st Street to 4th Street, and First Street from Kirby to Peabody
Intersecting Streets which are affected or define limits of closure: (See Diagram below)
Reason for Closure: New Student Convocation
Additional Closure Information:
Contact: Corey Thoss
Phone: (217) 333-4057
2019 NEW STUDENT CONVOCATION 8.23.19 Street Closures at First Street & Kirby Ave
Approved Street Closure - Kirby Ave from 1st to 4th St on 08-22-2019 from 8 pm to 9 pm
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Kirby Ave
Intersecting Streets which are affected or define limits of closure: Kirby Ave from 1st Street to 4th Street (See Diagram below)
Reason for Closure: Students headed to New Student Kick Off Event – Welcome Days
Additional Closure Information:
Contact: Corey Thoss
Phone: (765) 586-4575
2019 WELCOME DAY EVENT - Traffic closure Kirby Ave 8-22-19
Approved Sidewalk Closure - Sidewalk on North side of the North Quad from 8/19/2019 to 9/27/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk on North side of North Quad
Intersecting Streets which are affected or define limits of closure: South side of Beckman Institute (See Diagram below)
Reason for Closure: Paving stone replacement
Additional Closure Information:
Contact: Lisa Peacock
Phone: (217) 800-2541
Approved Sidewalk Closure - Sidewalk segments on North Quad 8-19-19 to 9-27-19
Approved Street Closure - Chalmers Street between Fourth St and Fifth St from August 8 to August 12
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Chalmers Street
Intersecting Streets which are affected or define limits of closure: Chalmers Street between Fourth St and Fifth St (See Diagram below)
Reason for Closure: Repair pavement failures
Additional Closure Information: Please do not park on the street near the construction site or in areas that are posted “No Parking.” Travelers are asked to proceed cautiously through work zones and use alternate routes whenever possible. The contractor will attempt to complete construction activities as soon as possible to minimize any inconvenience to residents in the area.
Contact: Pete Vanderkloot
Phone: (217) 403-4700
08.07.19 - Chalmers Street Road Closure
Approved Sidewalk Closure - Sidewalk to the North of the Coordinated Science Lab and Chiller Plant from 08-01-2019 to 08-14-2019
Approved Sidewalk Bike Path Closure - RORG Southwest of Allen Hall starting
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
Sidewalks & bike path segments south & west of Allen Hall; 13 parking
spaces in lot F13. Red Oak Rain Garden Re-installation site prep and sidewalk work.
Reason for Closure: Red Oak Rain Garden Reinstallation site prep and sidewalk work.
Intersecting Streets which are affected or define limits of closure:
See diagram
Additional Closure Information:
Contact: Stacey DeLorenzo
Phone: 217-300-1750
Approved Campus Traffic Closure - Peabody traffic lanes south sidewalk - 4th to 6th on 7-16-19
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: A section of Peabody Drive between Krannert Art Museum and Law Building. Also, the sidewalk on the south side of the street will be closed off but they could still use the north sidewalk.
Intersecting Streets which are affected or define limits of closure: A section of Peabody Drive between Krannert Art Museum and Law Building.
Reason for Closure: A crane will have to utilize the street for lifting new equipment into the Law Building as part of project U16030.
Additional Closure Information: Peabody traffic closure
Contact: Jeff Stewart
Phone: 217-841-0779
Approved Campus Traffic Closure - St Mary’s Road from Goodwin Avenue to Dock entrance at Vet Med Basic Science from 6/11/2019 to 6/13/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: St Mary’s Road from Goodwin Avenue to Dock entrance at Vet Med Basic Science CLOSURE FROM 8 AM – 3:30 pm (Temp Closure)
Intersecting Streets which are affected or define limits of closure: Street to be closed between St. Mary’s Road from Goodwin Avenue to Vet Med driveway entrance
Reason for Closure: Water main broken and needs to be repaired

Additional Closure Information: St Marys Road street Closure-Goodwin to Vet Med June 11-13-2019
Contact: Rube King
Phone: 217-840-3985
Approved Campus Traffic Closure - Bike Path + Sidewalk immediately South of Evans Hall from Goodwin Ave to the Busey Residence from 6/10/2019 to 8/5/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk + Bike Path
Intersecting Streets which are affected or define limits of closure: Bike Path + Sidewalk immediately South of Evans Hall from Goodwin Ave on the West to the Busey Residence sidewalk on the East.
Reason for Closure: Contractor is performing demolition in this area (See attached CSK) and due to ongoing construction at Freer Hall, rerouting bicyclists and pedestrians is impractical.


Additional Closure Information: Approved Sidewalk & Bike Path Closure - South of Evans Hall for roof work starting 6-10-19
Contact: Hector Romero
Phone: 708-942-9241
Griffith and Bailey Drive closed On June 8th and 9th
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
Griffith and Bailey Drive will be closed from 6/8/2019 to 6/9/2019, weather depending. The barricades will be removed at around 1 pm on Sunday, June 9th.
Intersecting Streets which are affected or define limits of closure: Griffith and Bailey Drive
Reason for Closure: Event for Annual Fire College
Additional Closure Information: Griffith and Bailey Drive closed On June 8th and 9th
Contact: Mark Berg
Phone: 217-841-3903
Approved Campus Traffic Closure - Sidewalk on the North side of Pennsylvania Ave from Goodwin to IBRL from 6/3/19 to 6/10/2019
Approved Campus Traffic Closure - Sidewalk on the NE corner of the English Building from 5/22/19 to 5/29/2019
Approved Campus Traffic Closure - Armory Avenue from 4th St to 6th St from 5/17/2019 to 6/1/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Armory Avenue from 4th St to 6th St
Intersecting Streets which are affected or define limits of closure: 5th Street will be open, but the intersection at Armory will be closed
Reason for Closure: MCORE Pavement Work

Additional Closure Information: Approved Closure - Armory Ave Closure 5-17-19 TO 6-1-19
Contact: Stacey DeLorenzo
Phone: 217-300-1750
Approved Campus Traffic Closure - Sidewalk segments near Alma Mater on 5/14/19 from 7 am to 12 pm
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk segments near Alma Mater
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Alma Mater Hackberry Tree Removal

Additional Closure Information: Approved Sidewalk Closure - Sidewalk segments around Alma Mater on 5-14-19
Contact: Dustin Reifsteck
Phone: 217-202-6136
Approved Campus Traffic Closure - Dorner Drive (north bound north of Peabody) from 5/13/19 to 6/10/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Dorner Drive (north bound north of Peabody)
Intersecting Streets which are affected or define limits of closure: Peabody Drive and Gregory Drive
Reason for Closure: Installation of new chilled water service to Plant Sciences Laboratory. Chilled Water Mains are in the street.

Additional Closure Information: Approved Closure - Dorner Drive northbound traffic lanes & west sidewalk starting 5-13-19
Contact: Josh Rubin
Phone: 217-300-2469
Approved Campus Traffic Closure - South sidewalk along Armory from 6th to Wright from 4/22/2019 to 9/1/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The South sidewalk along Armory from 6th St to Wright St will be closed from 4/22/2019 to 9/1/2019, weather depending.
Intersecting Streets which are affected or define limits of closure: See diagram;
Note: This closure will take place after the Armory Ave South sidewalk is open from 4th to 6th
Reason for Closure: Water Line, Street light, Storm Sewer installation new pavement, curb and gutter, sidewalk.
Additional Closure Information: Approved Traffic Closure - South sidewalk along Armory from 6th to Wright from 4/22/2019 to 9/1/2019
Contact: Tom Proctor
Phone: 202-6641
Approved Campus Traffic Closure - Kirk Drive and south ½ of parking lot west of Kirk Drive on either 4/19/2019, 4/22/2019, or 4/23/2019 for one day
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Kirk Drive and south ½ of parking lot west of Kirk Drive will be closed on either 4/19/2019, 4/22/2019, or 4/23/2019 for one day. MET will be drilling borings in one lane while leaving the other lane open to allow traffic to access affected parking lots and buildings. MET will also be able to move off hole rapidly if emergency occurs.
Intersecting Streets which are affected or define limits of closure: Gerty Drive is the north limit and circle drive is the south limit
Reason for Closure: Pavement Cores and Borings
Additional Closure Information: Approved Traffic Closure - Kirk Drive and south ½ of parking lot west of Kirk Drive on either 4/19/2019, 4/22/2019, or 4/23/2019 for one day
Contact: Zach Wilcoxen/ Nick Wendling
Phone: 217-549-5538 / 217-359-2128
Approved Campus Traffic Closure - South 10’ of Armory, section of pavement at 5th St,sidewalk and bike path south side of Armory from 4th to 6th from 4/12/2019 to 4/15/2019
Approved Campus Traffic Closure - Peabody Ave. 4th to 6th on 4-3-19
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
A section of Peabody Ave and the south sidewalk between 4th St and 6th St, between Krannert Art Museum and Law Building, will be closed from 6 am to 5 pm, weather permitting. The north sidewalk will remain open for pedestrian traffic.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is necessary to place a crane for lifting new equipment into the Law Building as part of project U16030.
Additional Closure Information: Approved Traffic Closure - Peabody traffic lanes & south sidewalk - 4th to 6th on 4-3-19
Contact: Jeff Stewart
Phone: 217-841-0779
Sidewalk that begins on the east side Agricultural Engineering Science Building heading east ending at the north-south sidewalk between Wood Engineering and the Art-East Annex Studio from 4/1/2019 to 5/31/2019
South Sidewalk of Peabody at 4th Street closed from 3/28/2019 to 4/15/2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The South Sidewalk of Peabody at 4th Street will be closed from 3/28/2019 to 4/15/2019, weather depending.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Excavation and Installation for MS FPC Generator Pad.
Additional Closure Information: Approved Traffic Closure - South Sidewalk of Peabody at 4th Street closed from 3/28/2019 to 4/15/2019
Contact: Zach Huffman
Phone: 217-390-4833
Sidewalk, northeast of Education Building, will be closed on 3-28-2019
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The Sidewalk, northeast of Education Building, will be closed on 3-28-2019, weather depending. It is expected that the sidewalk will be reopened at 12 pm on the same day. The sidewalk to east and north will be open. Pedestrians can still get through.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Truck will need to park there, extend hose to basement level window, provide cleanout of tank.
Additional Closure Information: Approved Traffic Closure - Sidewalk, northeast of Education Building, on 3/28/19
Contact: Shannon Tucker
Phone: 217-244-1760
NW corner of Gregory and Goodwin, and NW corner of Gregory and 6th St
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The Northwest corner of Gregory and Goodwin and the Northwest corner of Gregory and 6th Street will be barricaded, and Gregory Drive where the Quad and South Quad connect will be blocked on 4-7-2019 from 8 am to 2 pm for runners, weather depending.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Illini Veterans Memorial 5K
Additional Closure Information: Approved Traffic Closure -The intersection of Gregory Drive at Goodwin, 6th Street, and where the Quad and South Quad connect.
Contact: Matthew Cutright
Phone: 217-994-3039
SDRP- Street and partial sidewalk closure (South Sidewalk Only)
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
SDRP - Street (Gregory/Euclid and Gregory/3rd) will be closed and partial sidewalk closure (South Sidewalk Only) for Crane setup. East and West bound traffic will be rerouted. South Sidewalk will be affected, and North will be open.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Crane setup
Additional Closure Information: Approved Traffic Closure - SDRP- Street and partial sidewalk closure (South Sidewalk Only) on 3/19/19
Contact: Tyler Kutz
Phone: 217-722-4174
Sidewalk and Bike Path on the South side of intersection of Sixth and Armory
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The Sidewalk and Bike Path on the South side of intersection of Sixth and Armory will be closed from 3/16/2019 to 3/23/2019, weather depending, for Water line and Storm Sewer installation. Two-way traffic on Armory, SB Sixth street will be able to turn both directions onto Armory, NB Sixth will have to turn left at Gregory.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Water Line and Storm Sewer installation
Additional Closure Information: Approved Traffic Closure - Sidewalk and bike path South side of intersection of Sixth and Armory from 3-16-19 to 3-23-2019
Contact: Tom Proctor
Phone: 202-6641
Street, Bike Lane, and West Sidewalk on Fourth St. from Kirby Ave. to Pennsylvania Ave.
Closure Begins:
Reopens:
Date of Closure: 3/11/19
Date of Re-opening: 4/1/19
Street(s), Sidewalks, Bike Path or Parking to be Closed: South Bound Bike lane and street traffic lane on S. 4th St.
Intersecting Streets which are affected or define limits of closure: South Bound Bike lane and street traffic lane on S. 4th St.
Reason for Closure: Utility work at Memorial Stadium
More information and maps
Southbound Vehicle Traffic (with the exception of MTD & DRES Buses and
Emergency Vehicles) will be closed on Fourth St from Pennsylvania to Kirby starting
on Wednesday, March 13, 2019. This closure will be in effect until Monday, April 1,
2019, weather permitting. Southbound traffic can turn right (west) at Peabody and continue south on First Stor turn left (east) and continue south on Maryland Drive or Lincoln.
This closure is due to an unexpected utility conflict while contractors are installing
new utilities to serve the new Illinois Football Performance Center.
Approved Traffic Closure - SDRP- Street and partial sidewalk closure (South Sidewalk Only)
Closure Begins:
Reopens:
APPROVED TRAFFIC CLOSURE View this email in your browser Approved Traffic Closure: SDRP- Street and partial sidewalk closure (South Sidewalk Only) The SDRP - Street (Gregory/Euclid and Gregory/3rd) and partial sidewalk (South Sidewalk Only) will be closed on 3/19/2019 (all-day), weather depending, for a crane setup. East and West bound traffic will be rerouted. South sidewalk will be affected, North is open.
Please see the closure website for more information. Approved Closures IF THERE ARE ANY MAJOR ISSUES THAT WILL ARISE FROM THIS CLOSURE CONFIGURATION, PLEASE DIRECTLY CONTACT TRANSPORTATION DEMAND MANAGEMENT COORDINATOR, STACEY DELORENZO sdeloren@illinois.edu, 217-300-1750 (w) 217-722-4992
2019 Facilities & Services, All rights reserved.
Contact: STACEY DELORENZO
Phone: 217-300-1750, 217-722-4992
Daniels Hall – North Sidewalk closed
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The sidewalk North of Daniels Hall will be closed on 3/12/2019, weather depending, for Directional Bore setup.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Directional Bore Setup
Additional Closure Information: Approved Traffic Closure - Daniels Hall – North Sidewalk closed on 3/12/2019
Contact: Tyler Kutz
Phone: 217-722-4174
Goodwin Apartments - South Center Entrances and sidewalk closed
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The South Center Entrances and the sidewalk, for the Goodwin Apartments, will be closed on 3/12/2019 (or alternative of 3/13/2019), weather depending, for Crane setup.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Crane setup
Additional Closure Information: Approved Traffic Closure - Goodwin Apartments - South Center Entrances and sidewalk closed on 3/12/2019
Contact: Tyler Kutz
Phone: 217-722-4174
Sidewalk & Bike Path on the South side of Armory; 4th St to 6th St (tentative dates)
St. Mary's Rd from First to Lincoln on 2-16-19
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
St. Mary’s Road (Between Lincoln and 1st) will have at least one lane closed on 2-16-19 from 8:45 am to 11 am, weather depending, for runners and Hazelwood (between 1st and 4th) for 5k- Road Race for Animals put on by OTS (Veterinary School)
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: 5k- Road Race for Animals put on by OTS (Veterinary School)
Additional Closure Information: Approved Traffic Closure - St. Mary's Rd from First to Lincoln on 2-16-19
Contact: Brittany Senecal
Phone: 720-343-0414
Approved Campus Traffic Closure - Sidewalk East side of S Wright Street near ECE
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The Sidewalk on the east side of Wright St,segments north and south of the loading dock at the Electrical & Computer Engineering Facility, 306 N Wright Street, Urbana, IL, will be closed on 12-27-2018 from 7:00 am to 3:00 pm, weather permitting.
Intersecting Streets which are affected or define limits of closure: This segment is between E Clark Street and E White Street East side of S Wright Street.
Reason for Closure: To hoist up racking system for PV arrays installation on roof.
Additional Closure Information: Approved Sidewalk Closure - Sidewalk & Service Drive along Wright St by ECE 12-27-18
Contact: Shannon Mingee
Phone: 217-202-1830
Sidewalk & Bike Path Segments
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
Segments of sidewalks south of the construction site for the Design Center (between Fourth St and Sixth St, south of Huff Hall) will be closed from 12-20-18 to 1-4-19, weather permitting.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is required to make a connection to the water main for the new Design Center building
Additional Closure Information: Approved Sidewalk Closure - Sidewalk south of the Design Center Construction site 12-20-18 to 1-4-19
Contact: Mike Rosenberger
Phone: 314-333-1302
Approved Campus Traffic Closure - Sidewalk to Personnel Building
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
A segment of sidewalk that is north of the Stock Pavilion on the South Quad will be closed from 12-12-18 to 1-18-19, weather permitting
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is for steam tunnel repairs
Additional Closure Information: Approved Sidewalk Closure - Sidewalk on south Quad just north of the Stock Pavilion 12-12-18 to 1-18-19
Contact: Daniel Wilson
Phone: 217-202-5728
Approved Campus Traffic Closure: Near Vet Med
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
A segment of Goodwin extended will be closed on the east side of the Vet Med Chiller Plant from 7 am - 12 pm on 12/11/18, weather permitting.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is necessary to install a new cooling tower
Additional Closure Information: Approved Closure - Section of Parking Lot & Street near Vet Med 12-11-18
Contact: Doug Steepleton
Phone: 217-954-8044
Approved Campus Traffic Closure - Gregory Dr. thru traffic Oak to First
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
Gregory Dr. from Oak St to First St will be closed to thru traffic from 12-10-18 to 12-17-18
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is required to replace pavement due to utility work
Additional Closure Information: Approved Closure - Gregory Drive from Oak to First 12-10-18 to 12-17-18
Contact: Rube King
Phone: 217-840-3985
Approved Campus Traffic Closure: Main St west of Mathews and sidewalk along Mathews
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
A segment of the Bike Path and Sidewalk south of Huff Hall will be closed 12-3-18 to 12-10-18
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is required for work needed to make a connection of storm sewer.
Additional Closure Information: Approved Sidewalk Closure - Sidewalk south of Huff Hall from 12-3-18 to 12-10-18
Contact: Mike Rosenberger
Phone: 314-333-1302
Approved Campus Traffic Closures: Main St west of Mathews and sidewalk along Mathews
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
Main St. west of Mathews will be closed. Mathews Ave. will remain open. The sidewalks along W Main St. to the north and the south will be closed and the sidewalk on the west side of Mathews between Main and the Hydrosystems High Bay will be closed 11-29-18 until approximately June 2020
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is required for tree removal and the construction work for the CE Hydrosystems renovation and expansion project.
Additional Closure Information: Approved Closure - Main St west of Mathews & sidewalk segment on west side of Mathews north of Main starting 11-26-18
Contact: Larry Backes
Phone: 309-404-9128
Approved Campus Traffic Closure - Sidewalk to Personnel Building
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
A segment of Goodwin extended will be closed on the east side of the Vet Med Chiller Plant from 7 am - 12 pm on 11-8-18
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is required to remove the old cooling tower
Additional Closure Information: Approved Closure - Section of Parking Lot & Street near Vet Med 11-8-18
Contact: Doug Steepleton
Phone: 217-954-8044
Approved Campus Traffic Closure - Gregory Dr. thru traffic Oak to First
Approved Campus Traffic Closure - Sidewalk to Personnel Building
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The sidewalk from the street (Gregory Dr. parking spaces) to the Personnel building facing Gregory Dr. as well as the sidewalk from the west side driveway to the front walkway will be closed from 11-5-18 to 11-12-18
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is required to replace steam service piping system
Additional Closure Information: Approved Sidewalk Closure - Sidewalk south of Personnel Services building facing Gregory Drive from 11-5-18 to 11-12-18
Contact: Rube King
Phone: 217-840-3985
Approved Campus Traffic Closure - Sidewalk & Bike Path Segments
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
A segment of Sidewalk & bike path on the South Side of Peabody Dr east of Sixth St starting at the entrance to Parking Lot E-11 heading east for 200 feet will be closed from 10/29/18 to 11/28/18, weather permitting.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is required for steam tunnel repairs
Additional Closure Information: Approved Closure - sidewalk & bike path on south side of Peabody 10-29-18 to 11-28-18
Contact: Daniel Wilson
Phone: 217-202-5728
Approved Campus Traffic Closure - Sidewalk & Bike Path Segments
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
A segment of the sidewalk along the east side of Fourth St between Peabody & Huff Hall circle drive south entrance will be closed from 10/26/2018 to 1/2/2020, weather permitting. This closure will take affect after the utility work is completed and all lanes are opened at the intersection of Peabody & Fourth St. This closure is required to install a construction entrance and site fence. Heavy truck traffic at this location will occur related to the the new Design Center project.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: This closure is required to install a construction entrance and site fence. Heavy truck traffic at this location will occur related to the the new Design Center project.
Additional Closure Information: Approved Sidewalk Closure - Sidewalk on east of Fourth St between Peabody & Huff Hall 10-26-2018 to 1-1-2020
Contact: Mike Rosenberger
Phone: 314-333-1302
Approved Campus Traffic Closure - Sidewalk East side of S Wright Street near ECE
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
The Sidewalk on the east side of Wright St,segments north and south of the loading dock at the Electrical & Computer Engineering Facility, 306 N Wright Street, Urbana, IL, will be closed on 10-1-2018 from 6:00 - 8:00 am, weather permitting.
Intersecting Streets which are affected or define limits of closure: This segment is between E Clark Street and E White Street East side of S Wright Street.
Reason for Closure: To place a Crane lift needed to place roof protection and roof repair materials on the roof
Additional Closure Information: Approved Sidewalk Closure - Sidewalk & Service Drive along Wright St by ECE 10-1-18
Contact: Eric Bartlow
Phone: 217-497-1320
Approved Campus Traffic Closure - Sidewalk north of Smith Memorial Hall
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
A segment of the Sidewalk north of Smith Memorial Hall at the northwest corner of building will be closed from 9/14/18 to 10/15/18, weather permitting.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Masonry work to add an enclosure around the new generator.
Additional Closure Information: Approved Sidewalk Closure - Sidewalk north of Smith MemorialHall 9-14-18 to 10-15-18
Contact: Rob Gadson
Phone: 248-914-0002
Approved Campus Traffic Closure - New Student Convocation 8-24-2018
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
Segments of Kirby Ave and First St (around Memorial Stadium) will be closed to vehicular traffic from 9:30 - 1:00 pm on Friday, 8/24/18.
- Kirby Ave from First St to Fourth St will be closed to vehicular traffic from 9:30 am - 11:30 am
- First St from to Kirby Ave to Peabody will be closed to vehicular traffic from 11:00 am - 1:00 pm
Intersecting Streets which are affected or define limits of closure: Kirby & First; Kirby & Fourth; First & Peabody
Reason for Closure: New Student Convocation
Additional Closure Information: 2018 NEW STUDENT CONVOCATION 8.25.18 Street Closures at First Street & Kirby Ave
Contact: Corey Thoss
Phone: 765-586-4575
Approved Campus Traffic Closure - Griffith & Bailey near IFSI
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Griffith Dr south of Gerty & Bailey Dr
Intersecting Streets which are affected or define limits of closure: Griffith & Bailey
Reason for Closure: Event for Annual Fire College
Additional Closure Information: Approved Traffic Closure - Griffith & Bailey by IFSI 6-9-18 & 6-10-18
Contact: Mark Berg
Phone: 217-841-3903
Approved Traffic Closure - Pennsylvania Ave from Fourth St to east of Sixth St 5-14-18 to 8-10-18
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Pennsylvania Avenue from Fourth Street and continuing east for 1273 LF. Reconstruction intersects 6
th street with approximately 30 LF of 6
th street being reconstructed. i.e. to radius return; Access to all parking lots will remain via temporary entrances
Intersecting Streets which are affected or define limits of closure: Sixth St & Pennsylvania Ave
Reason for Closure: Reconstruction of Pennsylvania Avenue
Additional Closure Information: Approved Traffic Closure - Pennsylvania Ave from Fourth St to east of Sixth St 5-14-18 to 8-10-18
Contact: Stacey DeLorenzo
Phone: 217-722-4992
Campus Traffic Closure - Griffith Drive south of Gerty Drive - 4/30/18
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Griffith Drive south of Gerty to E-43 north-end parking lot entrance
Intersecting Streets which are affected or define limits of closure: n/a
Reason for Closure: Reconstruction of road segment
Additional Closure Information: Approved Traffic Closure - Griffith Drive south of Gerty Drive 4-30-18 to 5-21-18
Contact: Stacey DeLorenzo
Phone: 217-722-4992
EMERGENCY Approved Closure - bike path on east side of Sixth St between Lorado Taft & Gregory 3-29-18 to 4-11-18-18
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: bike path on east side of Sixth St between Lorado Taft & Gregory bike path on east side of Sixth St between Lorado Taft & Gregory
Intersecting Streets which are affected or define limits of closure: N/A
Reason for Closure: Repair roof leaks at Wohler's Hall
Additional Closure Information: The sidewalks are open along this path & can be used by bicyclists.
EMERGENCY Approved Closure - bike path on east side of Sixth St between Lorado Taft & Gregory 3-29-18 to 4-11-18-18
Contact: Kerry Butler
Phone: 217-714-9415
Sidewalk Segment West of Wohler's Hall
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sixth Street sidewalk & section of entrance to Wohler’s Hall
Closure Begins:
Reopens:
2/23/2018 17:00:00
Note: This work is weather dependent. Actual work day(s) may change due to inclement weather.
Intersecting Streets which are affected or define limits of closure: Accessibility for the west entrance to Wohler's Hall will be maintained throughout project work. Pedestrian access can use the bike path adjacent to the sidewalk on the east side of Sixth St.
Reason for Closure: Lift needs to be placed for chimney work at 2 locations on the roof of Wohler’s Hall
Additional Closure Information:
Approved Closure - sidewalk west of Wohler's Hall 2-21-18 to 2-23-18
Contact: Kerry Butler
Phone: 217-333-6238
Contact: Kerry Butler, Roofing Shop Foreman
Phone: 217.333.6238, 217-493-6864
Sidewalk south of Smith Memorial Hall
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk south of Smith Memorial Hall Work Area 1 will be closed off for several days to install water main. Fence will be relocated to Work Area 2 for remainder of contract work. This will close the southeast exterior door..
Intersecting Streets which are affected or define limits of closure: N/A
Reason for Closure: Site utility work for water main installation for Smith Memorial Hall Renovation
Additional Closure Information: Map
Contact: Al Munoz
Phone Number: 217-721-8612
Fourth Street – West Sidewalk – Between Kirby & Peabody
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Fourth Street – West Sidewalk – Between Kirby & Peabody
Intersecting Streets which are affected or define limits of closure: The West Fourth Street Sidewalk from Kirby to Peabody will be closed to the public. Pedestrian traffic will be diverted to the East Sidewalk via a temporary crosswalk just north of the cemetery.
The Permanent Crosswalks will be closed at Pennsylvania and Fourth. See attached markup up for further clarity.
Reason for Closure: Construction of the Memorial Stadium Football Performance Facility & Associated Utility Work.
Additional Closure Information: Approved Traffic Closure - Fourth Street – West Sidewalk – Between Kirby & Peabody 12-1-17 to 7-31-19
Contact: Zach Huffman
Phone: 217-390-4833
Gregory Dr west of Goodwin including sidewalk section near Animal Sciences Lab
Sidewalks and Bike Racks around Smith Memorial Hall
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk around Smith Memorial Hall including part of north sidewalk, west bicycle parking, and part of south sidewalk at Smith Memorial Hall.
Intersecting Streets which are affected or define limits of closure: S Matthews Ave and W Nevada St
Reason for Closure: Renovation of Smith Memorial Hall site work
Additional Closure Information: Approved Closure - sidewalks and bike racks around Smith Memorial Hall 9-28-17 to 10-15-18
Contact: Al Munoz
Phone: 217-721-861
IBRL drive & crossing sidewalk along Pennsylvania Ave
Utility Relocation at Mathews and Nevada
Clark Street (Between Mathews and Goodwin)
First Street Closure for Convocation
Kirby Avenue Closure for Convocation
Peabody Street Closure for Convocation
Move-in Safety Night near Fire Department on Campus
Traffic Closure - Service Drive north of Green between Engineering Hall & MSEB
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: The service drive between Engineering Hall & the Materials Science Engineering Building north of Green Street will be closed to vehicular traffic. The sidewalk in that segment will be open to pedestrians & bicyclists.
Intersecting Streets which are affected or define limits of closure: Service Drive between Engineering Hall & the Materials Science Engineering Building
Date of Closure: 8/12/17
Date of Re-opening: 8/23/17
Goodwin Avenue - Periodic Lane Closure
Closure Begins:
Reopens:
The project consists of pavement patching; curb and gutter removal and replacement and other miscellaneous work on portions of Goodwin Avenue from Oregon Street to Clark Street. Periodic lane closures can be expected starting Friday, August 11, 2017 and ending Friday, August 18, 2017.
Further information about the 2017 Concrete Patching Project can be found on the City website at
http://www.urbanaillinois.us/projects.
Sidewalk south of Grainger Library.
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:A portion of the sidewalk south of Grainger Library. Close a portion of the sidewalk on the west side of Mathews Ave. Block off (32) parking spaces in the campus parking lot between Mathews Ave and Goodwin Ave.
Intersecting Streets which are affected or define limits of closure: Mathews Ave, Goodwin Ave.
Reason for Closure: Install Cured-In-Place-Pipe (CIPP) in 18” sanitary sewers
Additional Closure Information: Approved Traffic Closure - Sanitary Sewer Work 8-7-17 to 8-8-17
Contact: Damon Horne
Phone: 314-308-2223
Euclid St & Segment of sidewalk on the north side of Peabody
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Euclid St & segment of sidewalk on the north side of Peabody
Intersecting Streets which are affected or define limits of closure: Intersection of Euclid and Peabody
Reason for Closure: Replace concrete
Additional Closure Information: Approved Traffic Closure - Euclid at Peabody 8-4-17 to 8-10-17
Contact: ROBERT KING
Phone: 217-333-0756
Illinois Street Emergency Road Closure
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Illinois Street from Lincoln Avenue to Gregory Street will be closed to through traffic
Intersecting Streets which are affected or define limits of closure: Illinois Street from Lincoln Avenue to Gregory Street
Reason for Closure: An emergency communications utility repair
Additional Closure Information:
Contact: John Collins
Phone: 217/384-2380
First Street Sidewalk Closure
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk on west side of First Street across for Mixed Use Building at 1904 South First Street.
Intersecting Streets which are affected or define limits of closure: St. Mary's Road
Reason for Closure: Domestic Water Installation
Additional Closure Information: First Street Sidewalk Closure
Bike lane on S. Goodwin Ave and sidewalk next to Engineering Science Bldg.
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Bike lane on S. Goodwin Ave and sidewalk next to Engineering Science
Bldg. A portion of the sidewalk south of Grainger Library.
Intersecting Streets which are affected or define limits of closure: Goodwin Ave
Reason for Closure: Cleaning and televising of storm sewer.
Additional Closure Information: Approved Traffic Closure - Bike lane & sidewalk along Goodwin Ave 6-19-17 to 6-21-17 PDF
Contact: Damon Horne
Phone: 314-308-2223
Lincoln Avenue Road Closure
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Lincoln Avenue
Intersecting Streets which are affected or define limits of closure: Between Iowa Street and Ohio Street
Reason for Closure: Emergency tree removal
Additional Closure Information: Lincoln Avenue Road Closure
Contact: Michael J. Brunk
Phone: 217/384-2393
Fourth Street Lane Closure
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Northbound lane of Fourth Street
Intersecting Streets which are affected or define limits of closure: Between Springfield Avenue and Healey Street
Reason for Closure: Storm sewer improvements and repairs
Additional Closure Information: 06.02.2017 - Fourth Street
Sidewalks and Bike Paths on Southwest Side of Wohler's Hall
Griffith & Bailey Drive Closure
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: n/a
Intersecting Streets which are affected or define limits of closure: Griffith and Bailey Drive
Reason for Closure: Event for Annual Fire College
Additional Information: Map
Expected Time of Closure: 0700-1800 Saturday 0700-1300 on Sunday
Expected Time of Re-opening: 1300 Sunday
Contact: Mark Berg
Phone: 217-841-3903
Bike Parking Area south of Armory
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Armory South – Bike Racks will be relocated so they are accessible
Intersecting Streets which are affected or define limits of closure: See Drawing C1.0 attached – no streets are impacted, just the current bike parking racks (which will be relocated for usage)
Reason for Closure: Construction at Armory South Exterior & Floors 1-3
Additional Closure Information: Approved Traffic Closure - Bike Parking Area south of Armory 6-6-17 to 7-1-2018
Contact: Naail Mirza
Phone: 217.840.3338
First Street Closure
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: First Street
Intersecting Streets which are affected or define limits of closure: From St. Mary’s Road to Kirby Avenue
Reason for Closure: Asphalt paving project
Additional Closure Information: 05.23.2017 - Bituminous Overlay - First Street
Gregory Drive, North of Surveying Bldg
South Orchard Street – Phase 2 Closure
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Orchard Street, South of Orchard Place Office to Parking Lot D Entrance
Intersecting Streets which are affected or define limits of closure: Florida to Orchard Place.
Reason for Closure: Roadway and Sidewalk Improvements
Additional Closure Information: Approved Traffic Closure - Orchard St Phase 2 from 5-24-17 to 7-3-17 PDF
Contact: Shanon Borntrager, Stark
Phone: 217-300-4245 , 309-665-2984
1207 Gregory Drive - North Side of Animal Sciences Bldg.
Stoughton Avenue Clousre
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Stoughton Avenue
Intersecting Streets which arc affected or define limits of closure: Between Mathews and Goodwin
Reason for Closure: Uni HS School Event
Additional Information: Map
Contact: Mike Adams
Phone: 217-244-4916
Sidewalk section & bike lane southside of Gregory Dr near Animal Sciences Lab
East Armory Ave. from 4th Street to 6th Street.
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: East Armory Ave. from 4th street to 6th street. South 5th street from E. Armory to 200 ft north from intersection.
Intersecting Streets which are affected or define limits of closure: South Fourth/East Armory – East side of intersection closed. S. 6th street/E Armory – west side of intersection closed.
Reason for Closure: Mobilization of crane and hoisting or new chiller at Ice Arena.
Additional Closure Information: Approved Traffic Closure - Armory Ave 4th to 6th & 5th St intersection to the north from 5-22-17 to 5-24-17
North Side Sidewalk on West Side of Turner Hall
Gregory Drive North Sidewalk East of 6th Street
South Orchard Street – Phase 1 Closure
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: South Orchard Street – Phase 1 Closure
Intersecting Streets which are affected or define limits of closure: Florida to Orchard Place
Reason for Closure: Roadway and Sidewalk Improvements
Additional Information: Map
Contact: Kevin Price
Phone: 217-300-4245
West sidewalk east at Micro and Technology
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: West sidewalk east at Micro and Technology
Intersecting Streets which are affected or define limits of closure: NA
Reason for Closure: Installation of granite base and statue
Additional Information: Map
Contact: Greg Larson
Armory Ave. bike path extension west of Lincoln Ave
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Armory Ave. bike path extension west of Lincoln Ave
Intersecting Streets which are affected or define limits of closure: west of Lincoln Ave & north of Iowa St
Reason for Closure: install new bike path
Additional Information: Map
Update:
The re-open date for the following closure is unknown due to the amount of rain we have had in the area. Further information will be provided at a later time.
Contact: Patrick Thompson
Phone: 217-607-1500
South East sidewalk of Main Library
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: South East sidewalk of Main Library
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: South East Roof Dormer of Main Library
Additional Information: Map
Contact: Mike Murphy
Phone: 217-333-6238
Gregory Drive
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Gregory Drive
Intersecting Streets which are affected or define limits of closure: Between S 6th St. & S Goodwin Ave
Reason for Closnre: Illini Veterans Memorial 5K
Additional Information: Map
Contact: Brent Blackwell
Phone: 847-903-5551
Peabody Dr. from 6th St. to 4th St
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Peabody Dr. from 6th St. to 4th St.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Mom’s Weekend RSO Event – Mother/Daughter Tandem Riding (Slow and Fast Categories)
Additional Information: map
Contact: Lily Wilcock, ATC
Phone: 217-244-6865
Third Street Road Closure
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Third Street between John Street and Green Street.
Intersecting Streets which are affected or define limits of closure: NA
Reason for Closnre: In order to complete utility work and pavement patching
Contact: Harman Jordan
Phone: (217) 403-4700
St. Mary’s St. from the intersection with Lincoln to 4th St.
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: St. Mary’s St. from the intersection with Lincoln to 4th St.
Intersecting Streets which are affected or define limits of closure: 4th St. and Lincoln will be open to traffic but will have runners along the side paths.
Reason for Closure: OTS Road Race
Additional Information: map
Contact: Caitlin Hemby
Phone: (248)520-9570
Sidewalk Closure, North of Surveying Bldg
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk Closure, North of Surveying Bldg
Intersecting Streets which are affected or define limits of closure: Sidewalk closure on South side of Gregory Drive, North of Surveying Building
Reason for Closure: Project #U14072 - Surveying Bldg Renovation, Section of sidewalk has been removed as part of construction activities.
Additional Information: Map
Contact: Howard Awbrey
Phone: 847-997-7849
Sidewalk Running through the north side of Bardeen Quad
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk Running through the north side of Bardeen Quad South of Building 1301 will be have moving closures as the cleaning progresses from west to east. The entire sidewalk will not be closed small areas will be closed as the work progress
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: Sewer cleaning and televising by the Urbana & Champaign Sanitary District
Additional Information: Map
Contact: Vickie Lyons
Phone: 217-390-7122
Sidewalk running through Bardeen Quad between Wright and Mathews
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk running through Bardeen Quad between Wright and Mathews, the closure will be moving along the sidewalks path as the sewers are cleaned and the manhole is raised to grade-please see attached map-manhole to be raised is identified on the map. The entire sidewalk will not be closed small areas will be closed as the work progress from west to east.
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: Raising a sanitary manhole to grade and cleaning and televising sewer by the Urbana & Champaign Sanitary District
Additional Information: Map
Contact: Vickie Lyons
Phone: 217-390-7122
Sidewalk & Bike Path North of Lincoln Ave Residence Hall
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk & Bike Path
Intersecting Streets which are affected or define limits of closure: No intersections affected; the sidewalk & bike path are located North of Lincoln Ave Residence Hall
Reason for Closure: Repair damaged underground utility
Additional Information: Map
Contact: Jim Vollrath
Phone: 265-8133
Springfield Avenue and Matthews Avenue Street Closures
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:
Springfield Avenue from Wright Street to Goodwin Avenue and
Matthews Avenue from Springfield Avenue to Green Street
Detour: A detour route will be established utilizing Wright Street to University Avenue to Goodwin Avenue to Springfield Avenue.
Contact: City of Urbana Public Works
Phone: (217) 384-2342
North bound Maryland sidewalk and parking
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk and Parking
Intersecting Streets which are affected or define limits of closure: North bound Maryland Dr (parking) and sidewalk west of Maryland Dr in front of Meat Sciences Laboratory (1503 Maryland Drive, Urbana)
Reason for Closure: Utility Repair Work
Additional Information: map
Contact: Jim Vollrath
Phone: 217-265-8133
North bound Maryland Dr
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk and Parking
Intersecting Streets which are affected or define limits of closure: North bound Maryland Dr (parking) and sidewalk west of Maryland Dr in front of Meat Sciences Laboratory (1503 Maryland Drive, Urbana)
Reason for Closure: Utility Repair Work
Additional Information: Map
Contact: Jim Vollrath
Phone: 217-265-8133
Green Street Road Closure - MCORE Project Begins
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Green Street Road Closure
Intersecting Streets which are affected or define limits of closure: Between First Street and the Canadian National Railroad tracks
Reason for Closure: MCORE Project begins
Additional Closure Information: Press Release and
Phasing map
Contact: Kris Koester
Phone: 217.403.4700
Sidewalk and bike racks on north side of Loomis
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk and bike racks on north side of Loomis. Pathway for emergency egress will be provided but area will be blocked off from regular foot traffic.
Intersecting Streets which are affected or define limits of closure: None
Reason for Closure: Crane on site to set new AHU-1 at Loomis. Work is associated with U14076: CoE EPC Project 003.
Additional Information: map
Contact: Jim Cantrell
Phone: 217-840-8994
Sidewalk NE Entry of Armory Building
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalk / Entrance Door
Intersecting Streets which are affected or define limits of closure: Sidewalk off Armory Ave to the Armory Building (NE Entrance)
Reason for Closure: A JLG vertical stock picking lift needs to be parked or extend over the sidewalk in front of the North East Entrance to the Armory
Additional Information:
Map
Contact: John Deerick
Phone: 217-766-7231
Clark Street
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Clark Street between Fifth Street and Sixth Street
Intersecting Streets which are affected or define limits of closure: Fifth Street and Sixth Street
Reason for Closure: In order to patch pavement from a water service repair
Third Street between Green Street and Healey Street
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: one block of Third Street between Green Street and Healey Street.
Intersecting Streets which are affected or define limits of closure: NA
Reason for Closure: In order to remove a tower crane at 212 East Green Street
East University Avenue
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed:one westbound lane of University Avenue between Wright Street and Sixth Street
Intersecting Streets which are affected or define limits of closure: Wright Street and Sixth Street
Reason for Closure: complete a concrete pour at 608 East University Avenue
West Clark Street & Corner of Clark/Matthews
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Partial closure of W Clark Street (Clark is one way, traffic not affected) and closure of sidewalks at north corner of Clark and Mathews
Intersecting Streets which are affected or define limits of closure: Clark and Mathews
Reason for Closure: Replacing glazing on south and west sides of west elevator tower
Additional Information: Map
Contact: Josh Rubin
Phone: 217 300 2469
North side of Springfield East of Uni High
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: Sidewalks
Intersecting Streets which are affected or define limits of closure: Sidewalk Closure on north side of Springfield Ave in the middle of the block (during 12/6-12/19) and near UNI HIGH 11/22 - 12/23); fence will be erected.
Reason for Closure: Building Demolition
Additional Information: Map
Contact: S. Renee Wiley
Phone: (217) 621-9683
Sidewalk north of Lincoln Ave Residence Hall
Closure Begins:
Reopens:
Street(s), Sidewalks, Bike Path or Parking to be Closed: A segment of the sidewalk north of Lincoln Avenue Residence Hall / south of the Child Developmental Lab
Intersecting Streets which are affected or define limits of closure:
Reason for Closure: Infrastructure Repair – EMERGENCY REPAIR