Crane Lift – Lincoln Avenue Residence Halls
May 20, 2026 | 6:58 am
Various facility and site closures will occur related to masonry assessment and improvement work.

Links
Documents
To support a masonry project at the Lincoln Avenue Residence Halls (Leonard and Shelden), occupancy is not allowed on any floor of the building in the designated crane lift area, as shown on the project floor plans (link below) for the period specified. The contractor will also establish related traffic control methods in nearby locations. Additionally, the project team is coordinating with the facilities staff of the affected unit about these restrictions to ensure that no individuals are within the crane boundary when the work commences.
Crane Lift Specifics
Building: Lincoln Avenue Residence Halls (0141)
Address: 1005 S. Lincoln Avenue
Date: Thursday, May 21
Time: 8 a.m.–6 p.m.
Floor Plans PDF
More approved U. of I. street, sidewalk, and pathway closures are available at https://go.fs.illinois.edu/Closures. University-related transportation questions should be directed to Transportation Systems Manager Stacey DeLorenzo sdeloren@illinois.edu, 217-300-1750.
Thank you in advance for your cooperation while this work is being performed.