Crane Lift – Turner Student Services Building
Nov 12, 2026 | 8:15 am
Facility and site closures will occur at the facility on November 14 to support electrical upgrades.

Links
To support ongoing elevator upgrades at the Turner Student Services Building, occupancy will not be allowed anywhere in the facility (for the date and time specified below). The contractor will also establish related traffic control methods in nearby locations. Additionally, the project team is coordinating with the facilities staff of the affected unit about these restrictions to ensure that no individuals are within the facility when the work commences.
Crane Lift Specifics
Building: Turner Student Services Building (0188)
Address: 610 E. John Street
Date: Saturday, November 14
Time: 6 a.m.–1 p.m.
Facility Plan PDF
Team members whose work may be impacted by the crane activity should coordinate immediately with their supervisor(s) regarding any scheduling or operational adjustments. For questions, contact project managers Hanzla Rafaqat rafaqat2@illinois.edu, 217-954-3346, and Basel Bakeer bbakeer@illinois.edu, 314-341-1125.
Approved U. of I. street, sidewalk, and pathway closures are available at https://go.fs.illinois.edu/Closures. University-related transportation questions should be directed to Transportation Systems Manager Stacey DeLorenzo sdeloren@illinois.edu, 217-300-1750.
Thank you in advance for your cooperation while this work is being performed.