Skip to main contentFacilities & Services
Strategic Initiatives

Restroom and Laboratory Dispenser Upgrades

Dec 09, 2025 | 11:08 am 

Upgrades will take place in 40 more campus buildings over the winter break.

Black Tork paper towel dispenser

Starting Monday, January 5, 2026, new toilet paper, hand towel, and soap dispensers will be installed in the restrooms and laboratories of 40 additional university facilities. The process is expected to be completed before the start of the spring semester for the buildings listed below.

The dispensers in this set (examples shown on the F&S website) are more durable and are often utilized in high-traffic areas, such as airports, conference centers, stadiums, and arenas. Participating vendors have performed walkthroughs of the buildings to get an accurate count of the dispensers in each facility. They also took measurements to ensure the specific designs fit appropriately in existing locations, minimizing the potential for follow-up repairs.

The work, which will include installing over 1,200 dispensers in approximately 600 spaces, exemplifies Building Services’ commitment to enhancing sustainability in all aspects of custodial operations. The units will help reduce unintended product waste, utilize green cleaning supplies, and provide greater service consistency and efficiency – eliminating the need to stock multiple non-standardized products for refill. Also, all previous metal and plastic dispenser parts that can be recycled will be diverted from the landfill at the Waste Transfer Station as part of zero waste efforts on the Urbana campus.

For questions about this initiative, contact Pete Varney, 217-333-7583.

Buildings in This Phase

  • 508 S. Sixth Street
  • 1205 W. Nevada Street
  • Agricultural Bioprocess Laboratory
  • Agricultural Engineering Sciences Building
  • Animal Sciences Laboratory
  • Architecture Annex
  • Astronomy Building
  • Ceramics Building
  • Ceramics Kiln House
  • Children’s Research Center
  • Construction Engineering Research Laboratory
  • Doris Kelley Christopher Hall
  • Engineering Hall
  • Engineering Sciences Building
  • English Building
  • Harker Hall
  • Integrated Bioprocessing Research Laboratory
  • Law Building
  • Mechanical Engineering Laboratory
  • Newmark Civil Engineering Laboratory
  • Nuclear Radiation Laboratory
  • Office Of Admissions and Records Building
  • Plant Sciences Laboratory
  • Police Training Institute – Tactical Training Center
  • Quonset #7
  • Quonset #8
  • School of Information Sciences Building
  • School Of Labor and Employment Relations
  • Seitz Materials Research Laboratory
  • Speech and Hearing Science
  • Superconductivity Center
  • Swine Research Center
  • Transportation Building
  • Turner Hall Turner Greenhouses
  • Turner Student Services Building
  • University High School
  • University High School Gymnasium
  • Waste Transfer & Materials Recovery Facility
  • Wood Engineering Laboratory

Related Providers

Building Service Workers


Building service workers (BSWs) work around the clock in four major shifts to keep campus buildings clean.

BSW putting in trash can liner.

Related Services



Facilities & Services

1501 South Oak Street Champaign, IL 61820

Phone: (217) 333-0340

Email: fsserviceoffice@illinois.edu